Delay cost calculator

What is a stalled approval
actually costing you?

Approval delays don't announce themselves as a bill — they arrive as interest you're still paying, rent you're still paying, and a house you can't live in yet. Put your numbers in and see the figure.

Finance

Construction and bridging loans usually sit above standard home loan rates. Use the rate on your facility, not the advertised one.

While you wait

Site costs cover fencing, scaffold hire, site sheds and supervision that keep running while nothing is being built. Leave at zero if your site isn't established yet.

If it's an investment

For a completed dwelling sitting empty waiting on an Occupation Certificate.

How long is the delay?

8weeks
Cost of the delay
$0

Fill in the costs on the left to see what a delay is worth.

Every week it drags on$0

Where it goes

Estimate only. This is a simple arithmetic tool using the figures you enter — it doesn't account for tax, capitalised interest, escalating build costs, contract variations or liquidated damages, all of which can make a real delay cost more than this. It is not financial advice. Check your own numbers with your accountant or broker.

Get My Free Assessment

Reading the number

Most delays aren't caused by
the build. They're caused by paper.

The figure on the right is the part people don't budget for. It runs whether or not anything is happening on site — which is why an approvals delay is more expensive than it looks.

01
Before the CC

Waiting on a consultant report

A condition requiring an acoustic, arborist or geotechnical report, discovered late. The report takes a week. Getting into the consultant's diary takes three.

Typical: 3–6 weeks
02
Before the CC

A Section 4.55 modification

The construction drawings drifted far enough from the consent that the certifier can't issue. Now there's a separate application with its own assessment period.

Typical: the largest single delay we see
03
Before the OC

A missing trade certificate

The waterproofer finished eighteen months ago and has changed phone numbers. The work is fine. The evidence isn't there.

Typical: weeks, occasionally months

The comparison worth making

Put your weekly figure next to what it costs to have the documentation prepared properly the first time. For most Northern Beaches projects the whole package costs less than a handful of weeks of delay — which is the entire argument for doing it once, correctly, up front.

How the maths works

No black box. Just
arithmetic you can check.

Weekly cost is the sum of your loan interest (balance × rate ÷ 52), your weekly rent or accommodation, your annual rates, insurance and utilities divided by 52, weekly storage, weekly site costs, and any rental income you're not receiving. Multiply by the number of weeks. That's the whole calculation.

Deliberately conservative. It ignores capitalised interest compounding, build cost escalation between quote and start, contract price rises, and any liquidated damages in your building contract. A real delay usually costs more than this figure, not less.

Nothing is sent anywhere

The calculator runs entirely in your browser. Your figures aren't transmitted, stored or seen by us — there's no form submission behind it.

Want the real number for your project?

Send us your consent. The free assessment tells you which conditions are on your critical path and how long each realistically takes — which is the input this calculator can't guess for you.